Do not refresh calendar on each event added
When displaying a lot of events, the calendar view spend a lot of time adding event one by one. This trigger a full update of the canvas at each addition.
When displaying a lot of events, the calendar view spend a lot of time adding event one by one. This trigger a full update of the canvas at each addition.
assigned to @ced
added tryton type::performance + 1 deleted label
added 1 deleted label and removed 1 deleted label
review264841002 updated at https://codereview.tryton.org/264841002/#ps288611002
It requires rev 0e06a6be083e to not crash.
New changeset 3a05eb5d43e6 by Cédric Krier in branch 'default':
Use new event store when displaying calendar
https://hg.tryton.org/tryton/rev/3a05eb5d43e6
added 1 deleted label and removed 1 deleted label
closed
New changeset 2dc2870c558a by Cédric Krier in branch 'default':
Use new event store when displaying calendar
https://hg.tryton.org/tryton-env/rev/2dc2870c558a