Given products, Bag with Qty:100 , Orange with Qty:100 and Orange Pack with Qty:0.
Given BOM, Orange Pack Bom with input 1*Bag, 4*Orange and output 1*Orange Pack
Go to production>>configuration>>Work Center Categories
Add Work Center Category: Packing Jobs
Go to production>>configuration>>Routings>>Operations
Add Operation: Pack items with Work Center Category: Packing Jobs
Go to production>>configuration>>Routings
Add Pack Orange Routine with Supplier: <Blank> and Operation: Pack items, Sequence: , BOM: Orange Pack Bom
Go to production>>configuration>>Work Centers
Add Pack Orange Job with Company: My Company, Parent: , Category: Packing Jobs, Warehouse: Warehouse, Cost Price: 1, Cost Method: Per Cycle
Go to production>>productions
Add production with Reference: , Number: , Planned Date: <today>, Planned Start Date: <today>
Product: Orange Pack, BOM: Orange Pack Bom
Quantity: 3, Unit: Unit, Routing: Pack Orange Routine
Work Center: Pack Orange Job
Save production // it is PD11
Click Wait //successful
Click Assign //successful
Click Run //successful
Click Done //not successful with message Production “PD11” can not be done because work “Packing items @PD11” is not finished.
Go to production>>Works
A works is listed which was created by product PD11.
Click the works, On Cycles, Click + to get (1/1) a new record.
I try to enter some number in Duration but no number is accepted.
Note: The above procedure works in Tryton ver 4.4 |