Calc cost on production
Hi,
Trying this scenario, give bad cost production:
BOM
IN:
PROD A: 5.11 yds (19.5 c/u) = 99.645
OUT
PROD B: 1 unit = 9.645
PROD C: 1 unit = 90.00
When the move is realized and the production order processed, this are the cost:
IN:
PROD A: 5.11 yds (19.5 c/u) = 99.645
OUT
PROD B: 1 unit = 99.645
PROD C: 1 unit = 99.645
So, give the message: misses_cost
Working on trytond 2.8.2 and trytond_production 2.8.0.
Thanks in advance for your help!