The supply dates interval is shorter with multiple suppliers
Since #5575 (closed) the next supply date is computed based on a configuration period. So we do not have to minimize the interval but use the largest interval based on the supply period. Otherwise having multiple supplier may reduce the interval instead of using the "sum" of each supplier interval. And having a smaller interval reduce the possibility of optimization by grouping the purchases.